Here's a shot from the back. The basement rec. room and two bedrooms have been drywalled. Sheetrock on the main floor will start on Tuesday, February 19.
The front is where the action is. A video here would show some real brick slinging.
A bull dozer pushed some dirt (mud) around.
No comments:
Post a Comment